Bored Pile Construction

Bored cast-situ reinforced concrete pile installation technology is the foremost and most popular deep foundation construction method for infrastructures, bridges, power stations and buildings. Bored pile construction by percussion method was introduced by a few foreign companies in the country since the mid-fifties of the last century. Unfortunately, no significant advancement or improvement had taken place until the end of the first decade of this century since inception. In 2011, a few general contractors introduced state of the art modern and sophisticated technique for the first time in the country.

We added our first hydraulic drilling rig to the existing fleet in 2013 and entered into the new era of bored pile construction history. Later we procured more equipment and parallelly strengthened our workforce by in-house job site and overseas training. As of today (Jan 2019) we have ten (10) drilling rigs with adequate supporting equipment like; crane, excavator, de-sanding unit, DG, air compressor, transporter etc. and we are now capable to take-up projects of any magnitude.


Bored Pile Resources at a Glance

SL No.

Item Description

Item nos

01

Top head drive hydraulic drilling rig

03

02

Lattice boom crawler crane

03

03

RT Crane

02

04

Diesel Generator

12

05

Wheel loader

03

 

Major Bored Pile Projects:

2018-19